Hot-dip Galvanized Steel Structure Water Tank Tower

product_banner
steel tower-5
Water tank bracket- 1
Water tank bracket- 2
steel tank tower-9
steel tank tower-15
steel tower-5
Water tank bracket- 1
Water tank bracket- 2
steel tank tower-9
steel tank tower-15

Hot-dip Galvanized Steel Structure Water Tank Tower

The hot dipped galvanized steel water tank 

is a new type water tank manufactured according to the GB:2SS177.


Inquire Now

Add To Cart

PRODUCT DESCRIPTION

Galvanized Steel Water Tank Tower:

This hot dip galvanized tank is suitable for:

1) the construction water storing, 

2) the regulating tank, 

3)heating system's inflation water tank,

4)the condensate tank as well as the building construction, 

5)the geological prospecting, 

6)the industry,

7) the defense project, firefighting, fire proof water storage. 

8) and other temporarily store water tank.


The standard:

The hot dipped galvanized steel water tank is a new type water tank manufactured according to the GB:2SS177. 

2, The HDG steel plate of the water tank:

1)   The plate is press by the special equipment, the surface is smooth, and the concave shape of the plate is good for reduce the pressure of the water pressed to the plate.

2)    This plate is made of Q235 steel.

3)The thickness: 3mm,2.5mm,2mm,1.5mm it is different according the size of the tank.

4) The size of the hot dip galvanized steel plate: 1000mm*1000mm, 1000mm*500mm, 500mm*500mm.

5) The size of the water tank, it can be design according the size of the location place, the tallest height is 5meters.



Materials:

Surface finish: galvanized or painted

H section steel column, beam, and angle steel support

The tower height can be 3m, 6m, 10m, 12m, 15m etc. At present, we have made the highest tower 28m.

Access ladder with safety cage

All the steel parts are prefabricated in factory, just assemble together with bolts&nuts.

Option of having a walkway around the tank

Installation service are available.

Design certificate from registered professional engineer



Installation:

The installment of the hot dip galvanized water tank.

1)    Make the bases of the water tank: concrete base or steel support tower.

 Make sure the bases at the same horizontal level, and the connection of the bottom plate loaded on the support bases.

2)    According to the direction of the water tank, welding connection, or connect by the bolts and nuts.

3)    After assembled, put in water to test the leakage. After fill full water 12hours, if not leakage, the water tank can be used normally.

Qualification Capacity

The workshop of Qingdao Sincere Steel Structure Co., Ltd. covered 30000 square meters.

The production capacity is about 5,000 tons steel structure per month,

1,000 tons of C and Z purlin, 

30,000 square meter sandwich panel,

5,000 square meter of metal sheet per month.

FAQ
  • Q1 : Can you supply design service?

    Yes. also supply design service.

  • Q2 : What is the payment terms?

    A) T/T, 30% deposit and other payment will be payed when you receive the ocean bll. B) 100% LC at sight

  • Q3 : How long is delivery?

    Generally, the delivery time of sandwich panel is within 7 days; and 30 days for prefabricated house. The exact delivery time should depend on the quantity and confirm with factories.

INQUIRE
Email Whatsapp Skype TOP